To upgrade and enhance the front entrance of the school which involved replacing the existing sliding cantilever gate with a new decorative automated swing gate, foliage removal and landscaping to the area to level the ground, new timber cladded fencing constructed out of Western Red Cedar wood, new kerb edgings, and enablement works for a new living wall, which consisted of installing a new water supply and timber frame for the living wall system to be mounted on. We also supplied and installed a new sign which was recessed into the living wall.
Challenge
Solution
A full site survey was carried out and design drawings were issued to ensure the proposal aligned with the scope.
Working closely with the school, we carried out the works during a two-week timeframe whilst maintaining security and safety throughout. We liaised with the other contractors on site and ensured the project was completed successfully and before schedule. A full handover and training on the new automation system was carried out on completion.